Our Need
Enrollment at Dayton Christian School has increased more than 75 percent in five years. This growth places greater demand on our campus’ space. An earlier facility feasibility study estimated that we could grow up to 1,500 students, but did not consider the demand we would face in needs outside the classroom. We lack the square footage for critical extracurricular needs including chapel, physical education, fine arts, and athletic programming.
A portion of our physical education classes take place in a faux gym that takes up 4,000-square-feet of educational space. The construction of an auxiliary gym would allow this space to be used as four more classrooms to meet enrollment projections for the next five to 10 years.
We also have a need to invest in a home track and soccer/football field for our athletic program. Currently, students drive up to 20 minutes away for practices and home games. This places student safety at risk and weakens our ability to grow as a community. Excellence in facilities – such as athletic fields – is extremely important given that up to 80 percent of our high school student body participates in the program each year.
GENESIS 7 CAMPAIGN PROJECTS
Total Cost: $7 million
10,500-Square-Foot Auxiliary Gym
Cost: $4 Million
Academic space for physical education
Additional competition and practice space for athletics
Dedicated area for theater productions
Enhanced 2,700-square-foot weight room
Home Athletic Field
Cost: $3 Million
A full-size athletic field* to allow soccer, football, and track to train at home.
Outdoor space aimed at building community by eventually hosting games on campus.
*Cost covers Phase 1: Field, track, drainage and fence. Phase 2 (lighting) and Phase 3 (bleachers, press box, and restrooms) will be an additional investment.
Will you answer this call?
Join us in the mission to inspire students to discover their God-given potential, become life-long learners, and stand on God's absolute truth.
STATS/QUICK FACTS
Largest private school in Dayton
2020-2021: 45% of building capacity
2024-2025: 80% of building capacity
76% PreK-12 enrollment increase past 5 years
115% PreK-Grade 4 enrollment increase in past 5 years
1,275 PreK-12 enrollment for 2024-2025
1,500 Enrollment capacity in current facility
7 classrooms created when performance center is built (5 classrooms from faux gym; 2 classroom from weigh room move)
20 minute drive time for student athletes to practice facilities (increasing safety concerns)
80% high school students who participate in athletics
28 school districts represented in DC student body